2025-11-01
MuscleSync: plan out algorithm for initialization, threshold detection, and in/out-of range notifications in main loopMuscleSync: begin MVP implementationWorked with Zvone on outdoor oven, record recipe
2025-11-02
Finish up MuscleSync MVP proof-of-concept software implementationBegin new TV47 signBegin learning TypstBegin CMS migration planning for juliaelyachar.com
2025-11-03
Implement MuscleSync MVP with actual hardwareTypst order confirmation template KUGW
2025-11-04
MuscleSync MVP demonstrationMiniOffice KUGWComplete Typst order confirmation templateEliCounter: begin architecture planning
2025-11-05
MWE Typst order confirmation Jinja templateWire up order confirmation for Plajer sladoled?Complete finishes to get Plajer sladoled ready for deploymentEliProjects: KUGW LJ16 panel writeupEliCounter: complete DB architecture plan
2025-11-06
Deploy Plajer sladoledFinalize Typst/Laravel PDF generation recipe; port Gaia web shop to TypstEliProjects: KUGW LJ16 panel writeupMiniOffice: purchase expanding foam
2025-11-07
Morning: hot water resevoir removed?Plajer/Gaia: hardcoded invoice proof-of-concept document in Typst- ~~Plajer: admin landing page with instructions how to use: view orders at
/orders, edit (or create) products at/products, ~~ Put TV47 room in order for working: clear closets of bedding, etc.; remove bed; move in desk, etc.
2025-11-08
EliCounter backendKimchiTV47 house sign trace and knife woodBegin TV47 attic BOM
2025-11-09
Contact MatevžEliCounter frontendTV47 attic planningCarve + paint TV47 new house sign + picturesPumpkin processing
2025-11-10
Prototype ripping studs from fosniGlue TV47 new house signTV47 attic planning: write out entire construction process
2025-11-11
TV47: KUGW moving workshop tools and cabinets from skedenj to pekarnaTV47: set up notebook + pencil basket in pekarna workshopTV47: move 5x stock to pekarna for rippingTV47: clean out kurilnica of remaining styrofoam/plumbing/electrical/construction wasteTV47: pictures and measurements of kurilnica peč and hot water tank for BolhaTV47: complete attic construction process write-upKUGW Go testingTODO list for Bidoof maintenanceGaia website sitemap for Ramšak rebrandLJ16 MiniOffice: fill timber/wall gaps with expanding PU foam
2025-11-12
- ~~LJ16 MiniOffice: clean up PU foam overspray and patch timber-wall gap ~~
Complete plastering/patchingEliCounter: complete full frontend/backend PoCMuscleSync website comments/reviewDocument recipe for handling dates and times between frontend/backend for Vue and LaravelTV47: Bolha ads for kurilnica peč and hot water tank and pumpkins
2025-11-13
EliCounter: rename Counted -> LogHisnaStevilka: pictures of complete TV47 house signTV47 renovation planning/materials KUGW
2025-11-14
Most of day went to family dinner/gathering for Martinovo. Otherwise managed morning KUGW TV47 pekarna workshop setup and R&D house sign with caulk+lath, mounted new house sign.
2025-11-15
Deploy EliCounterTV47 KUGW pekarna workshop setup: electrical planning.Backup hygeine—begin planning out actionable structure/requirementsTV47 attic renovation: BOM
2025-11-16
TehnoLes order/TV47 attic gym
2025-11-17
TehnoLes/TV47 attic gym/MuscleSync meeting to set up website/email and discuss future steps/ownership stake/salary
2025-11-18
TehnoLes/TV47 atticBuy nail gunTV47 attic: research jobsite-vacuums; decide desired features, find potential candidates, contact about purchaseMap out steps for Gaia Ramšak rebrand: website, labels, etc.EliProjects: finish out LJ16 panel implementation write-upCreate week-by-week roadmap for TV47 attic remodel to EliNotes
2025-11-19
Receive TehnoLes orderMove TehnoLes materials to atticTV47 attic: empty attic of all furniture, junk, etc. in west wingTV47 attic: arrange plumbing rough-in with ZaveršnikGaia/web: clean up and clarify Astro i18n recipe
2025-11-20
TV47 attic: take down ceiling T&G part 1TV47 attic: arrange work with AnžeGaia/web: begin work on Gaia -> Astro migration for Ramšak rebrand- ~~Web: standardize and document recipe for layout stack for full-screen-width websites ~~
2025-11-21
KUGW taking down ceiling T&G; reroute ceiling lightingDocuments backup/digital hygeine recipeMeet with Anže to discuss schedule, materials, building plans, etc.Gaia/web: KUGW Gaia -> Astro migration for Ramšak rebrand
2025-11-22
KUGW Gaia Ramšak rebrand + Gaia migration; improve Astro i18n setup; KUGW TV47 attic materials.
2025-11-23
Arrange new TehnoLes order and return of insulationKUGW Gaia Ramšak rebrand: home page + i18n improvementsGaia: learn to report DDV Evidence via MiniBlagajna; report for 2025Q3; record recipeMiniOffice: complete second sanding of timbers
2025-11-24
Clean MiniOffice of construction dustKUGW Gaia Ramšak rebrandTehnoLes order for new insulation
2025-11-25
Gaia Ramšak: complete skeleton for all pagesTV47 attic: finish taking down and storing all tounge-and-groove; finish emptying construction areaEliCounter: quality-of-life improvements
2025-11-26
KUGW Gaia Ramšak rebrand: migrate pages boilerplateTV47 attic: plans, clean-up, install leveled and shimmed subfloor bottom layer
2025-11-27
TV47 attic: install subfloor grid top layer and OSB panelsTV47 attic: install west wall ledgersKUGW Gaia Ramšak rebrand: filling out pages
2025-11-28
KUGW Gaia Ramšak rebrand: filling out page contentImage optimization script for web projectsLearn to use my Bosch laser level: theory + crash courseTV47 attic: electrical plan — finalize position of all fixtures, lights, switches, outlets, junction boxes; finalize circuits and breakers for each circuit; finalize wiring runs and wire gauge for each circuit
2025-11-29
- TV47 attic: electrical bill of materials
- TV47 attic: ventilation bill of materials