MiniGym
Find and purchase rubber flooring; transport to LJ16Empty gym roomInstall rubber flooring, cutting rubber flooring modules as needed to fit roomMove exercise equipment into MiniGymReplace exercise cable bar with climbing anchors and carabiners- Mount pull-up cables from climbing anchors
- Rack with hooks along walls for hanging up accessories, cables, etc.
Hallway MiniOffice
Clean out residual "junk" from big apartment era, e.g. stored kitchen equipment, bottles, shelves, used frying oil, etc.Electrical:Trace wiring from hallway junction box outside MiniOffice back to main panelConnect unused wire in hallway junction box to ground busbar in main panel and repurpose as a ground wireRun ground wire from hallway junction box into MiniOfficeInstall a junction box where cable from hallway enters MiniOffice- ~~Remove dangling light bulb; replace with a wall-mounted fixture ~~
Run modern cable from junction box to light switch box to supply switch and future outletsRemove old single-gang light switch box; cut out space in masonry wall for new two-gang box that can hold both switch and an outletInstall new two-gang box; replace old light switch with TEM SM10; install an outletCut out channel in masonry wall for conduit running from two-gang box to outlet location above computerCut out space in masonry wall for computer outlet box; install boxRun conduit and cable from two-gang box to computer outlet box; install outlet
- Timber frame cleanup:
Mechanically remove cracking plaster from structural wooden timbersSand down timbers with grinder flap disks to remove lingering plasterSand down timbers with random orbital sander to remove lingering plaster and restore clean wood
Patch gaps between timbers and wall with e.g. spackle or plasterClean existing plaster/masonry walls of any flaking pieces and obvious blemishes; patch as necessary- Final sanding of timbers to clean off any plaster
- Clean construction dust from entire space with e.g. wet rag
- Mask timbers, door/window trim, plumbing, etc. in preparation for painting
- Paint plaster surfaces with a cheerful vapor-diffusive mineral (e.g. silicate) paint
- Finish wood beams with e.g. linseed oil or a non-VOC finish
- Build and install a custom-fit computer desk
- Install accessories: monitor, speakers, etc.
Cleaning infrastructure
Mops/brooms hanging area:Remove defunct dishwasher mechanicals cabinetCorrect crooked outlet; cap off drain line, fill cracks where utilities penetrate wallFill and whitewash plaster wall around former cabinet areaInstall rack for hanging mops/brooms
Nice apartment to drop into
Clean up and order my apartment into a state such that I'd be pleased and proud to have people drop in whenever, unannounced, i.e. without my needing to clean things up.
- LJ16 house number
- LJ16 toilet paper holder
- LJ16 bathroom trash bin
- LJ16 kitchen trash bin
- Cleaning supplies area
Next
- Bathroom switches redoza
- Bike racks in basement: https://www.youtube.com/watch?v=Aiqv3RiO0Lo
Visions
A tablet running EliMusic is a next step above PiAmbient. Like, a finger-controlled interface to EliMusic where you can see all the songs laid out in front of you, without having to memorize all the track IDs, and control them with e.g. swipes and pushes and so on.
Rows and rows of clean glass spice jars in the fridge doorshelf with cool earthy shades of oranges and reds and browns and yellows holding single ingredients, holding Eli spice mixes, holding blends, etc.
Warm cozy office in hallway room, interior wrapped entirely in warm nicely-finished wood with a nice grain, warm and inviting, plenty of outlets, beams showing wood, etc.
In living room, a light fixture in every corner of living room around the one in the center